> ## Knowledge Base Index
> Fetch the complete knowledge base index at: https://support.workstatus.io/sitemap.xml
> Use this file to discover available pages before exploring further.
> Pure-Markdown content can be obtained by appending a '.md' suffix to the content URLs listed in the sitemap (without the trailing slash).

# Can I add time for two projects during the same timespan?

# Can I add time for two projects during the same timespan?

### Add Time for Two Projects at the Same Time

**QUESTION:**

Is it possible to add time for two projects during the same timespan?

**ANSWER:**

No, Workstatus will only allow you to work on one project during the same 10-minute interval. If you add manual time at the same block of time you have tracked automatically, the Workstatus will not allow for the same.

Please refer following link for accessing Roles and Permission : https://support.workstatus.io/en/article/workstatus-roles-and-permissions-guide-zzkoo6/

###### ![](https://storage.crisp.chat/users/helpdesk/website/f3e4eb6758a66800/8_108xz3o.jpg)
