Articles on: Projects

Can I add time for two projects during the same timespan?

Can I add time for two projects during the same timespan?



Add Time for Two Projects at the Same Time



QUESTION:

Is it possible to add time for two projects during the same timespan?

ANSWER:

No, Workstatus will only allow you to work on one project during the same 10-minute interval. If you add manual time at the same block of time you have tracked automatically, the Workstatus will not allow for the same.

Please refer following link for accessing Roles and Permission : https://support.workstatus.io/en/article/workstatus-roles-and-permissions-guide-zzkoo6/

Updated on: 15/02/2024

Was this article helpful?

Share your feedback

Cancel

Thank you!