Can I add time for two projects during the same timespan?
Can I add time for two projects during the same timespan?
Add Time for Two Projects at the Same Time
QUESTION:
Is it possible to add time for two projects during the same timespan?
ANSWER:
No, Workstatus will only allow you to work on one project during the same 10-minute interval. If you add manual time at the same block of time you have tracked automatically, the Workstatus will not allow for the same.
Updated on: 07/03/2023
Thank you!