How to integrate Trello with Workstatus ?
How to Integrate Trello with Workstatus?
Roles and Permissions:
Organization Owner/Manage :
- They can integrate Trello with Workstatus.
Please refer following link for accessing Roles and Permission : https://support.workstatus.io/en/article/workstatus-roles-and-permissions-guide-zzkoo6/
Login as Organization Owner/Manager.
Step 1: Navigate to setting.
Step 2: Click on Integrations.

Step 3: Click on add integrations.

Step 4: Click on trello to start the integration.

Step 5: Enter your Trello API key and redirect URL and Click Next to integrate Workstatus with Trello.

To find your Trello API key:
- Go to https://trello.com/power-ups
- Click on “API Key”
- Copy the API key and use it as needed

Step 6: Connect with your project.
Click on Connect Project to link a project with Trello.

Step 7: Map Trello project with Workstatus.
- Navigate to the Project Mapping section after integration.
- Select the Trello Project from the available list.
- Choose the Workstatus Project that you want to map with:
- You can select an existing project, OR
- Click on Create New Project to create a new one
- Once selected, all tasks from Trello will be synced into the chosen Workstatus project.
- Click on the Save button to complete the mapping.

- Use the Refresh option to check the current status.
- Click on the three dots to access options such as Sync, Connect, or Disconnect.
- For bulk operations, select multiple projects and connect or disconnect them at once.

Step 8: Map Trello User with Workstatus User.
- Go to the User Mapping section.
- Select the Trello User that you want to map.
- Choose the corresponding Workstatus User.
- Click on the Save button to complete the mapping.

Post-Integration Behaviour – Step-by-Step
Step 1: Task creation Flow
After successful integration, when you try to create a task in Workstatus,
- You will be redirected to Trello to create and manage the task.
Step 2: Integration direction (one-way sync)
This integration works in a one-way sync:
Tasks created in Trello will automatically sync to Workstatus
Synced tasks will be visible in Workstatus
Step 3: Task management (CRUD operation)
All task operations are controlled externally:
Create → Managed in Trello
Read/View → Redirected to Trello
Update → Managed in Trello
Delete → Managed in Trello
If you try to:
View task details OR
Add/update anything from Workstatus
- You will be redirected to Trello
Step 4: Behaviour after disconnection
If the integration is disconnected:
All new operations will be handled directly in Workstatus
Step 5: Existing task after disconnection
For tasks created during integration:
- You cannot edit or update
- You cannot delete
- You can only mark them as complete
Same task status is in progress in Trello and you again Connect then complete task status will match with Trello task status