How to Integrate ZOHO with Workstatus?
How to Integrate Zoho with Workstatus?
Roles and Permissions:
Organization Owner/Manage :
- They can integrate Zoho with Workstatus.
Please refer following link for accessing Roles and Permission : https://support.workstatus.io/en/article/workstatus-roles-and-permissions-guide-zzkoo6/
Login as Organization Owner/Manager.
Step 1 : Navigate to settings .
Step 2 : Click on integrations.

Step 3 : Click on Add Integrations.

Step 4 : Click on Zoho to start the integration .

Step 5 : Enter your Zoho Client Id, client secret key, and redirect url. Once all required details are filled in, click the ‘Next’ button to integrate with Zoho .

Step 6 : Connect with Project
Click on Connect Project to link a project with Zoho.

Step 7 : Map Zoho project With Workstatus
- Navigate to the Project Mapping section after integration.
- Select the Zoho Project from the available list.
- Choose the Workstatus Project that you want to map with:
- You can select an existing project, OR
- Click on Create New Project to create a new one
- Once selected, all tasks from Zoho will be synced into the chosen Workstatus project.
- Click on the Save button to complete the mapping.

Step 8: Map Zoho User with Workstatus User
- Go to the User Mapping section.
- Select the Zoho User that you want to map.
- Choose the corresponding Workstatus User.
- Click on the Save button to complete the mapping.

Post-Integration Behaviour – Step-by-Step
Step 1: Task creation Flow
After successful integration, when you try to create a task in Workstatus,
- You will be redirected to Zoho to create and manage the task.
Step 2: Integration direction (one-way sync)
This integration works in a one-way sync:
Tasks created in Teamwork will automatically sync to Workstatus
Synced tasks will be visible in Workstatus
Step 3: Task management (CRUD operation)
All task operations are controlled externally:
Create → Managed in Zoho
Read/View → Redirected to Zoho
Update → Managed in Zoho
Delete → Managed in Zoho
If you try to:
View task details OR
Add/update anything from Workstatus
- You will be redirected to Zoho
Step 4: Behaviour after disconnection
If the integration is disconnected:
All new operations will be handled directly in Workstatus
Step 5: Existing task after disconnection
For tasks created during integration:
- You cannot edit or update
- You cannot delete
- You can only mark them as complete
Same task status is in progress in Zoho and you again Connect then complete task status will match with Zoho task status