Unable to add projects in productivity plan?
Unable to add projects in productivity plan?
In the Productivity Plan, all tracked time is categorized under the Default Project.
Unfortunately, the ability to create and assign multiple projects is not available in this plan. To track time for specific projects and monitor user activity on each project, you would need to upgrade to the Everything Plan.
The Everything Plan allows you to:
- Create and assign multiple projects.
- Track time spent on individual projects.
- Generate detailed reports for each project.
You can explore the pricing and features of the Everything Plan here: https://www.workstatus.io/pricing
Updated on: 10/11/2025
Thank you!